KASRO long cap placement system DN250-DN600
Lateral intake rehabilitation
|
The long cap placement system is a further development of the KASRO cap placement system, which offers the user the possibility to install laminated caps with lengths of up to twenty meters from the main sewer. Differing from the laminated cap placement system, the cap is not pressed in but inverted from within the main pipe. A camera is located at the front of the unit and observes the inversion process. The cap placement shield is electrically heated and therefore accelerates the curing of the epoxy laminated cap. For the inverted long cap an ambient curing resin can be used although it is possible to use epoxy resin when curing with hot water.
|
||||||||||||||||||||